Guides for clients planning a fit-out in the UAE.

What a commercial fit-out actually costs in Abu Dhabi

What a commercial fit-out actually costs in Abu Dhabi

Breaks down where the money goes in a typical office fit-out (partitions, ceilings, MEP, joinery, furniture) and why a per-square-foot figure quoted without a specification is meaningless.

Authority approvals for fit-out in Abu Dhabi: a plain guide

Authority approvals for fit-out in Abu Dhabi: a plain guide

The submission sequence from landlord NOC through municipality and civil defence to final inspection, what each stage needs, and the realistic timeline for a standard commercial unit.

Design-and-build versus separate consultant and contractor

Design-and-build versus separate consultant and contractor

An honest comparison of the two procurement routes, including where design-and-build genuinely saves time and where appointing an independent consultant protects you better.

How to read a fit-out BOQ without being a quantity surveyor

How to read a fit-out BOQ without being a quantity surveyor

What the line items mean, which rates are worth comparing between tenders, and the provisional sums that quietly become variations later.

Fitting out a mall unit: working inside a landlord’s manual

Fitting out a mall unit: working inside a landlord’s manual

Hoarding, overnight access, technical review, deposits and handover conditions: what mall fit-out really involves and how to programme around it.

Office space planning: how many square feet per person

Office space planning: how many square feet per person

Density benchmarks for the UAE market, how meeting-room ratios have shifted, and the test-fit questions to answer before signing a lease.

Choosing finishes that survive commercial traffic

Choosing finishes that survive commercial traffic

Why a specification that looks perfect in a showroom fails in a reception after eighteen months, and the wear, cleaning and replacement questions to ask at selection.

Why joinery lead times decide your opening date

Why joinery lead times decide your opening date

How bespoke production slots, material batching and site measurement interact, and why joinery is usually the item that sets the critical path.

Signage that passes inspection the first time

Signage that passes inspection the first time

Illumination, emergency provisions, exit signage, landlord consent and structural fixing: the compliance side of a package most people treat as decoration.

Handover: what should be in your O&M pack

Handover: what should be in your O&M pack

As-built drawings, warranties, testing certificates, asset lists and the defects liability period: what to insist on before releasing final payment.

Refurbishing a hotel floor while guests are still in the building

Refurbishing a hotel floor while guests are still in the building

Phasing, noise windows, protected corridors, mock-up rooms and the operator approvals that make a rolling refurbishment work.

Clinic fit-out in the UAE: building to DOH and DHA requirements

Clinic fit-out in the UAE: building to DOH and DHA requirements

Room sizing, hygienic finishes, hand-wash provision and the inspection sequence that stands between a finished clinic and a licence to operate.

Planning a fit-out?

Planning a fit-out in the UAE?

Send us a floor plan and we’ll come back with a measured estimate within three working days.