New businesses opening
Who need a shopfront or reception sign in place before the doors open.

Service 04 · Signage and Branding
Your sign is the first thing anyone sees. We design it, get it approved, make it in the UAE and install it, including the power and fixings behind it that most people forget until it is too late.
Service 04
Modest Gift, W Hotel
In plain terms
Signage is the part of a project most people leave until last, and it is the part that most often causes a delay. By the time someone decides where the reception logo goes, the wall is finished and there is no electricity behind it. By the time the outdoor sign is ordered, the landlord wants a permission application that takes three weeks.
We treat signage as a construction job, not a printing job. The positions are decided during design. The power and fixings go in during the building work. The approvals are submitted at the same time as everything else. The sign is installed on a plan, not in a panic the night before you open.
We make everything in the UAE and install it with our own team, including work at height. And because we made it, we can repair it when a light fails in year two instead of telling you to buy a new one.
Who need a shopfront or reception sign in place before the doors open.
Needing a reception logo, meeting room names and signs that help visitors find their way.
Needing shopfront signs, menu boards and window graphics that satisfy the landlord’s rules.
Who need every sign across one or many locations replaced to a new standard.
Needing directories, floor numbers and a consistent tenant signage standard.
Our work
What is included
We can produce a single sign or an entire signage system across a portfolio of branches.
How it works, step by step
The approvals run alongside the making, so the sign is ready when the space is.
We decide what signs are needed and exactly where they go, working from your brand guidelines.
Every sign drawn with its size, materials, lighting, fixing method and power requirement.
Landlord, municipality and civil defence submissions, prepared and chased by us.
Finish samples and colour matched to your brand, plus a proof of the main signs.
Manufactured in the UAE while the power and fixings are already going into the building.
Fitted, aligned, powered up and tested, including access equipment and height-work permits.
Manufacturing usually takes two to four weeks once drawings and finishes are approved. Approvals can run at the same time, but outdoor sign permissions should be started early because they are the least predictable part of the process.
Deliverables
Costs, and how we quote
Signage is priced per sign, with materials and illumination listed. That lets you decide where to spend: an impressive main entrance sign and simpler internal ones is a perfectly sensible choice, and we will say so.
The quote includes the fixings, the installation and the access equipment needed to fit it safely. Quotes that exclude installation or scaffolding are not comparable prices, and this is the most common way signage quotes mislead.
Approval submissions are included. We do not charge separately for preparing municipality or landlord applications.
Why clients choose AGC
Positions, power and fixings are decided during design, so the wall is ready when the sign arrives.
We prepare and submit the landlord and authority applications and deal with the revisions.
Manufactured locally, so a change or a repair takes days rather than an import cycle.
Including work at height, with the right permits and equipment.
We made it, so when a driver fails in year two we fix the sign rather than replacing it.
The worries clients tell us about
Almost certainly for anything outdoors. Most outdoor signs need landlord consent and municipality approval, and units inside malls need a technical submission against the centre’s rules. We prepare and submit all of it for you, and we start it early because it is the least predictable part.
That is a real risk and it is why we engineer rather than simply print. Outdoor signs are built for wind load, UV and humidity, with sealed housings and commercial-grade electrical components. A sign made for a cooler climate fails quickly here.
You call us. We made the sign and hold its drawings, so we repair the failed part rather than selling you a replacement. Illuminated signage is the item most likely to need attention in year two, so we offer planned inspection as well.
Yes. We can work from an existing logo and develop the signage family from there: materials, sizes, colours and a consistent set of rules you can apply to future branches.
Yes. Removal, making good the wall and installing the new sign is routine for us, including out-of-hours work where a business cannot stop trading.
Frequently asked questions
Type a word to filter the answers, or call +971 56 343 7346.
AGC designs, manufactures and installs commercial signage in Abu Dhabi, including 3D letters, illuminated signs, shopfronts, wayfinding and graphics. We also prepare the landlord and municipality approvals and install with our own team.
Yes, for almost any outdoor sign. Shop and building signage typically needs landlord consent plus municipality approval, and mall units need a technical submission against the centre’s fit-out rules. AGC prepares and submits these on your behalf.
Manufacturing usually takes two to four weeks once the drawings and finishes are approved. Approvals can run alongside, but outdoor sign permissions should be started early because they are the least predictable part of the timeline.
Signage is priced per sign, based on size, materials and whether it is illuminated. Always check the quote includes fixings, installation and access equipment. Excluding those is the most common reason one signage quote looks cheaper than another.
Three-dimensional letters built up from acrylic, aluminium, stainless steel or brass and fixed to a wall or facade, rather than printed flat. They can be unlit, face-lit or halo-lit, and are the standard choice for reception and shopfront branding.
Yes, including work at height with the correct permits and access equipment. Outdoor signs are engineered for wind load, UV exposure and humidity, and fixed with methods suited to the specific facade material.
Yes. We remove old signage, make good the wall or facade, and install the new identity to one consistent standard across every location, including out-of-hours work where a business cannot stop trading.
Both. We can work from your existing brand guidelines, or develop the signage design and sign family ourselves if your brand does not yet extend to the built environment.
Yes. Signage and branding is a standalone service, and many clients come to us for signage alone after another contractor completed their space.
We do, because we manufactured it and hold its drawings, so the failed driver or LED is repaired rather than the whole sign replaced. Planned inspection and maintenance is available after installation.
No questions match that search. Ask us directly and we will answer within a working day.
Get a signage quote
Send your logo and a photo or floor plan of the space. We will come back with a sign list, drawings and a price that includes making, approving and fitting it.